Hellenic Center and Social Hall

Location
Charleston, South Carolina

Size
25,198 SF

The Greek Orthodox Church of the Holy Trinity in Charleston, SC included a two-story administration building and classroom facility, and a single-story social hall with a commercial kitchen. The construction included load bearing concrete masonry walls and structural steel framing with exterior metal studs, and reinforced concrete floors on concrete piles. The elevated floor is concrete on steel decking and steel structural framing with a framed roof.

Partners include: Liollio Architecture – Design Architect, Bello Garris Architects – Architect of Record, Forsberg Engineering, 4SE, Inc., RMF Engineering, Seamon Whiteside and Associates, Inc., Camacho Associates, Inc. and Thomas Mechanical Heating/Cooling Refrigeration.