Absolute Haitian

Location

Moncks Corner, SC

Project Size

115,343 SF

Absolute Haitian awarded THS Constructors with the contract to construct their new North American facility in Moncks Corner, South Carolina.

Absolute Haitian is a world leader in injection molding machinery, engineering and quality standards. They are focused on providing a broad range of cost effective plastics injection molding standards.

THS had to mitigate unsuitable soils on the building site and outside the building envelope before construction could begin. The site also required the installation of earthquake drains to stabilize the building.

The facility is a 115,000 SF warehouse with an adjoining three-story office (5,200 SF per floor). The warehouse is structural steel frame with precast walls. The office makes use of high-end interior finishes, ACM metal panels and curtain wall glazing.

Adjoining the warehouse is a Class-A, 5,200 SF (per floor), three-story office. The office makes use of high-end interial finishes, ACM metal panesl and curtain wall glazing.

Delivery Method

Design-Build

Construction Details

Structural steel frame with precast walls and high-end finishes

Architect

MCA Architecture

Project Duration

13 Months

Engineers

Arrowood + Arrowood; American Engineering Consultants, Inc.; Caviness Lambert Engineering, LLC

Related Projects